[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret

上傳人:仙*** 文檔編號(hào):34484977 上傳時(shí)間:2021-10-21 格式:DOC 頁數(shù):30 大?。?27.52KB
收藏 版權(quán)申訴 舉報(bào) 下載
[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret_第1頁
第1頁 / 共30頁
[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret_第2頁
第2頁 / 共30頁
[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret_第3頁
第3頁 / 共30頁

下載文檔到電腦,查找使用更方便

10 積分

下載資源

還剩頁未讀,繼續(xù)閱讀

資源描述:

《[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret》由會(huì)員分享,可在線閱讀,更多相關(guān)《[南寧]市政道路施工組織設(shè)計(jì)( 城市次干路 投標(biāo))secret(30頁珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。

1、els requisits, amb cam adequat materials per compensar la compactaci de construcci. Tall carretera-part superior nivell, tenint en sinkage de compte per a la compactaci, el valor fixat per la prova. Desprs de 30cm del grau de compactaci del llit paviment no menys de 96%, carretera-part superior del

2、sl de ms de 30cm, la compacitat no s menys de 96%. Excavaci de seccions de roques, basat en dades geolgiques i escena, roca localment mitjanant canons per trencar. 9.2.2.4 TERRAPL: el primer tram petit de caixa de la carretera, K1 660-K1 + 720, K2 + 040-K2 + 180 local pargraf noms per a lembarcador,

3、 un total de 48,000, profunditat domplir en menys de 2m. (1) els segents materials no hauria de ser utilitzat com a material de farciment: llim, farcit de residus, omplir de terra, residus slids, residus de la construcci. Cont larrel i peribles. 。 Dins la construcci destructures de formig i metro de

4、 ciment s incapa de trencar els obstacles com ara excavadores i excavadores, mtode dutilitzar armes i recollida pneumtica de ser eliminat. Primera excavaci abans de la lnia dexcavaci i elevaci controlar etiquetes intelligents dinfart, com ara pintades pintura vermella estaques identificar elevaci me

5、surant la quadrcula de punts de control identificat per la cal, per assegurar que lexcavaci de la gamma i lelevaci amb precisi aconseguir lefecte de carretera-brut. Lexcavaci del sl abans de la confirmaci, utilitzant el mtode Visual i penetraci provador per provar lmbit de lexcavaci, si el sl comple

6、ix requisits de Fundaci, cavar directament, altrament informar la supervisi, disseny, qualitat i supervisi tcnica i altre personal relacionats en aquest lloc per confirmar i desenvolupar lesquema de tractament el tractament Fundaci suau. Quan lexcavaci a lelevaci, segons sl adequat es reserva artifi

7、cialment alt. (3) excavaci lexcavaci programa de crrega de treball i reduir volum basat en K0 + 440, K1 130 K1 + 480, K1 + 920 i diversos turons forma conjunt. Una profunditat de secci (secci XI) construcci de llit 13,7 m, B, K0 + 440 turons, terra a profunditat de secci (secci est) de construcci de

8、 carretera de profunditat de K1 + 480 9.0M, K1 840 9.8M, excavaci horitzontal a adoptar. Abans de lexcavaci en costat pendent verdes i installacions temporals drenatge. Prevenci tempesta arrossegada pistes, vessant col. lapse. De la relativament alta a linici de lexcavaci de cada pargraf. Fons dexca

9、vaci, Banc nivells, gruix de la capa de 3M - 4m. Cap construcci cavar dus indgenes, sl tallar pendent de 1:1. 5, pendent de roca amb 1:1. Si terra o pedra excavat, es van establir al vessant peu 1M alada de la plataforma ample 6m situat 2 plataforma amplria de m, la plataforma presenta un pendent de

10、 rases excavaci horitzontal. Quan els canvis es troben quan excavar les propietats del sl, va informar al comissari i propietaris de manera oportuna, modificar el pendent. EnIn order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, t

11、o prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of

12、President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per w

13、eek should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major

14、accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police station, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve

15、the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always maintained close contact and district police stations, canvassing support from the police station on school safety and help.

16、5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be

17、. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctional Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students

18、 to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate

19、 immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as

20、 fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire saf

21、ety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requir

22、ements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fireels processos dexcavaci de tall amb formaci de drenatge longitudinal i transversal, pendent, excavaci temporals desguassos per evitar sots per evi

23、tar estancament daigua caixa remull de la carretera. Quan les rees dexcavaci t aqfers, drenatge o precipitaci mesures adoptades abans de lexcavaci i moviments de terra. Per controlar estrictament disseny de laltura de tall podria no haver acabat. Si amb el temps, tallar la mateixa quantitat de sl pe

24、r omplir i compactat per la densitat requerida. No compleix els requisits, amb cam adequat materials per compensar la compactaci de construcci. Tall carretera-part superior nivell, tenint en sinkage de compte per a la compactaci, el valor fixat per la prova. Desprs de 30cm del grau de compactaci del

25、 llit paviment no menys de 96%, carretera-part superior del sl de ms de 30cm, la compacitat no s menys de 96%. Excavaci de seccions de roques, basat en dades geolgiques i escena, roca localment mitjanant canons per trencar. 9.2.2.4 TERRAPL: el primer tram petit de caixa de la carretera, K1 660-K1 +

26、720, K2 + 040-K2 + 180 local pargraf noms per a lembarcador, un total de 48,000, profunditat domplir en menys de 2m. (1) els segents materials no hauria de ser utilitzat com a material de farciment: llim, farcit de residus, omplir de terra, residus slids, residus de la construcci. Cont larrel i peri

27、bles. Material de farciment proves, davant el terrapl, testimoni presa de mostres, anlisi de mida de gra, daigua i contingut, densitat, lmit lquid i lmit plstic, Califrnia amb dAlembert i compactaci proves. Eficament a la prova de camp de lespcie de farciment per assolir el grau de compactaci. El ti

28、pus dequipament, les millors combinacions, velocitat denregistrament de prova, rodant i trituraci procs, embalatge de gruix de paviment soltes de cada capa, el contingut daigua del material; Cada material utilitzat per omplir el lloc. (4) requisits construcciSl subgrade segons les condicions del sl

29、en lmbit daquest projectes prioritaris de projecte en lmbit de la font de sl. Base de compactaci terrapl abans domplir, una nova assignaci de la secci de terrapl sotmesos a la supervisi de laprovaci de propietaris. Llit de zero-omplir carretera sota linterval 0-30 cm de grau de compactaci i no menys

30、 de un 96%, si no compleixen els requisits i fils cap amunt de nou desprs de la compactaci, grau de compactaci de complir els requisits estipulats. Ha de ser parallel al control dels nivells domplir de terrapl capa paviment; plena ocupaci jerrquica parallel pavimentaci, garantir el grau de subgrade

31、de compactaci. Amplada de cada capa de farcit establerts a cada costat ms enll el disseny damplada terrapl de 50cm per assegurar la retallada desprs de lembarcador de vora de pendent subgrade t suficient compacitat. Capa de farciment de terrapl de sls diferents minimitzar capes, cada capa de gruix d

32、e la capa de farciment no ser inferiorElectricity lines, equipment inspections, found hidden in time for rectification, maintenance, and security. 9, do not use an open flame in the classroom, prohibit burning stove, lit candles, mosquito repellent, no smoking, and banning messy wiring. Without usin

33、g any household appliances is not allowed. 10, live on campus faculty members, must lead by example, and educate families and children ready to fire. 11, household use of gas in schools, to master proper usage, pay attention to the leak-proof, explosion-proof, fireproof, closing valve after use to e

34、nsure security. 12, dining room must be qualified, and annual testing of pressure vessels, to regularly check, the canteen workers must be certified, strictly by operation operation, gas tank and stove safety distance of 1.5 meters, to prevent accidents. 13, the adverse consequences caused by ignori

35、ng fire safety regulations, will be punished, until investigated for legal responsibility. Song Lin Xiang Liu Jia ping elementary school March 2016 Xiang Liu Jia ping elementary school, pine slopes surrounding safety management system 1 teachers and students, the surrounding area of the school gover

36、nance covers personal and food hygiene, cultural events and other aspects, integrated governance shall obtain wide support and full cooperation of the community. On the surrounding environment in schools should be closely monitored. 2, school work at the same time, should pay attention to the safety

37、 management of school environment, should take the initiative to contact the district police station, the village Committee, Correctional Centre, Township government, business management and other departments to do a good job management. 3, teacher on duty with the exception of inspections in school

38、s, should also pay attention to environmental inspections near the campus, found that the jobless migrants from rural areas, for example, harassment of students and a variety of accidents, according to different situations reported school officials or the police station in a timely manner, to protec

39、t the safety of students. 4, every day before school, teachers remind students, pay attention to traffic safety. 5, should educate students to respect social ethics, and various regulations, maintaining public order, and fight the bad guys, and grasp the correct ways and means of maintaining and imp

40、roving students self-care ability. 6, the establishment of emergency rescue teams of teachers in schools, on high alert and deployed. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school teachers and students organizations out of safety management syste

41、m organization activities between teachers and students, to draw up a precise plan and security measures must be signed by the school officials to review the programme of activities agreed upon Correctional Center agreed to implement. Organization to the field relatively far or activities require ap

42、proval by the Deputy Director of the Education Bureau in charge of security. 2, each activity should have a specific responsibility, pay attention to the persons age, physical match. Route 3, activities, location, field surveys should be carried out in advance. 4, activities for the means of transpo

43、rt should explain the situation to the school to comply with vehicle, safety requirements, before the line for repairs. 5, each activity must have security, emergency response plan for accidents. 6, picnics, hiking, picnic to pay attention to fire prevention, food poisoning, prevention of fall accid

44、ents 7, the activities near the rivers, reservoirs, no measures or do not meet the security requirements of the Organization and not let students into the water目目 錄錄第一章第一章 總體概述總體概述 .4一、工程概況 .41、工程概述.42、施工條件.4二、施工總體方案 .61、施工分段.62、施工總體方案.6三、新技術(shù)、新工藝、新材料、新設(shè)備的使用 .61、設(shè)計(jì)原則.62、新建路面設(shè)計(jì)參數(shù).63、路面結(jié)構(gòu)組合設(shè)計(jì).7四、質(zhì)量目標(biāo) .

45、7五、工期目標(biāo) .7六、安全、文明施工目標(biāo) .8七、編制依據(jù)及原則 .8第二章第二章施工進(jìn)度計(jì)劃和各階段進(jìn)度的保證措施施工進(jìn)度計(jì)劃和各階段進(jìn)度的保證措施 .8一、施工進(jìn)度計(jì)劃 .8二、各階段進(jìn)度的保證措施 .92.1 確保施工進(jìn)度的總體措施 .112.2 各分部分項(xiàng)工程施工進(jìn)度計(jì)劃保證措施12三、項(xiàng)目部進(jìn)度違約責(zé)任制度.13四、進(jìn)度違約承諾.15第三章第三章 勞動(dòng)力和材料投入計(jì)劃及其保證措施勞動(dòng)力和材料投入計(jì)劃及其保證措施 .15第一節(jié)勞動(dòng)力投入計(jì)劃及其保證措施 .15一.勞動(dòng)力投入計(jì)劃.16二、勞動(dòng)力投入保證措施.16第二節(jié)材料投入計(jì)劃及其保證措施 .17一、材料投入計(jì)劃.17二材料計(jì)劃保證

46、措施.17第四章第四章機(jī)械設(shè)備投入計(jì)劃機(jī)械設(shè)備投入計(jì)劃 .17第五章第五章 施工平面布置和臨時(shí)設(shè)施布置施工平面布置和臨時(shí)設(shè)施布置 .19一、布置原則: .19二、施工場地布置 .19三、臨時(shí)道路 .19els requisits, amb cam adequat materials per compensar la compactaci de construcci. Tall carretera-part superior nivell, tenint en sinkage de compte per a la compactaci, el valor fixat per la prova.

47、Desprs de 30cm del grau de compactaci del llit paviment no menys de 96%, carretera-part superior del sl de ms de 30cm, la compacitat no s menys de 96%. Excavaci de seccions de roques, basat en dades geolgiques i escena, roca localment mitjanant canons per trencar. 9.2.2.4 TERRAPL: el primer tram pet

48、it de caixa de la carretera, K1 660-K1 + 720, K2 + 040-K2 + 180 local pargraf noms per a lembarcador, un total de 48,000, profunditat domplir en menys de 2m. (1) els segents materials no hauria de ser utilitzat com a material de farciment: llim, farcit de residus, omplir de terra, residus slids, res

49、idus de la construcci. Cont larrel i peribles. 。 Dins la construcci destructures de formig i metro de ciment s incapa de trencar els obstacles com ara excavadores i excavadores, mtode dutilitzar armes i recollida pneumtica de ser eliminat. Primera excavaci abans de la lnia dexcavaci i elevaci contro

50、lar etiquetes intelligents dinfart, com ara pintades pintura vermella estaques identificar elevaci mesurant la quadrcula de punts de control identificat per la cal, per assegurar que lexcavaci de la gamma i lelevaci amb precisi aconseguir lefecte de carretera-brut. Lexcavaci del sl abans de la confi

51、rmaci, utilitzant el mtode Visual i penetraci provador per provar lmbit de lexcavaci, si el sl compleix requisits de Fundaci, cavar directament, altrament informar la supervisi, disseny, qualitat i supervisi tcnica i altre personal relacionats en aquest lloc per confirmar i desenvolupar lesquema de

52、tractament el tractament Fundaci suau. Quan lexcavaci a lelevaci, segons sl adequat es reserva artificialment alt. (3) excavaci lexcavaci programa de crrega de treball i reduir volum basat en K0 + 440, K1 130 K1 + 480, K1 + 920 i diversos turons forma conjunt. Una profunditat de secci (secci XI) con

53、strucci de llit 13,7 m, B, K0 + 440 turons, terra a profunditat de secci (secci est) de construcci de carretera de profunditat de K1 + 480 9.0M, K1 840 9.8M, excavaci horitzontal a adoptar. Abans de lexcavaci en costat pendent verdes i installacions temporals drenatge. Prevenci tempesta arrossegada

54、pistes, vessant col. lapse. De la relativament alta a linici de lexcavaci de cada pargraf. Fons dexcavaci, Banc nivells, gruix de la capa de 3M - 4m. Cap construcci cavar dus indgenes, sl tallar pendent de 1:1. 5, pendent de roca amb 1:1. Si terra o pedra excavat, es van establir al vessant peu 1M a

55、lada de la plataforma ample 6m situat 2 plataforma amplria de m, la plataforma presenta un pendent de rases excavaci horitzontal. Quan els canvis es troben quan excavar les propietats del sl, va informar al comissari i propietaris de manera oportuna, modificar el pendent. EnIn order to ensure normal

56、 teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management syst

57、em. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety educat

58、ion, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense

59、 in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police station, a township peoples G

60、overnment shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always maintained close contact

61、 and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive measures, no corporal pu

62、nishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctional Centre, school principa

63、ls consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to scho

64、ol inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrail

65、s, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. Song Li

66、n Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fi

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!