淮北礦業(yè)集團袁二煤礦開采設(shè)計【含CAD圖紙+文檔】
壓縮包內(nèi)含有CAD圖紙和說明書,均可直接下載獲得文件,所見所得,電腦查看更方便。Q 197216396 或 11970985
摘要本設(shè)計以袁二煤礦10號煤層為開采煤層。10#煤層地質(zhì)條件較為簡單,煤層傾角5-25度,平均煤厚4m,礦井設(shè)計資源量106.6Mt,設(shè)計可采儲量90.56Mt,設(shè)計生產(chǎn)能力1.8 Mt/a,服務(wù)年限50.2a。本礦井采用立井開拓,設(shè)置主立井,副立井,回風(fēng)立井根據(jù)國家相關(guān)法律法規(guī)、行業(yè)設(shè)計規(guī)范和銀河煤礦提供的相關(guān)基礎(chǔ)資料,設(shè)計共提出了2個技術(shù)上可行、經(jīng)濟上較合理的井田開拓方案,經(jīng)過方案比選,最終確定選用方案一,即立井雙水平開拓,采區(qū)后退式開采,單一長壁綜合機械化一次采全高采煤法。設(shè)計首采區(qū)采用采區(qū)準(zhǔn)備方式,工作面長度200 m,采用一次采全高采煤法,全部跨落法處理采空區(qū)。礦井采用“三八”制作業(yè),兩班生產(chǎn),一班檢修。生產(chǎn)班每班3個循環(huán),日進6個循環(huán),循環(huán)進尺0.6 m礦井生產(chǎn)采用抽出式通風(fēng)方式,中央并列式通風(fēng)系統(tǒng)。設(shè)計選用箕斗作主提升,帶式輸送機作主運輸,無軌膠輪車罐籠作輔助提升,無軌膠輪車作為輔助運輸。關(guān) 鍵 詞:立井;上下山開采;運輸、通風(fēng)、環(huán)境保護設(shè)計類型:設(shè)計ABSTRACTThe paper is designed on the basis of 10# coal seam on Yuan er coal mine.The geological condition of 10#coal seam is simple and its dip angle coal is 5to 25 degree. Besides the average thickness of 10#coal seam is nearly 4m. The designed mine resource is 106.6 Mt and recoverable reserves is 90.56 Mt.The coal seam of design production capacity is 1.8Mt/a and the length of service is 50.2 years.This mine uses shaft development way, sets the main shaft, auxiliary shaft and air shaft.According to relevant state laws and regulations, Industry standard and Basic data Provide by Milky Way Coal Mine, the design put forward 2 technically feasible, economically reasonable mine development scheme. After the comparison, scheme 1 is seleted. That is adit opening in two level, panel strip retreating working, long wall fully mechanized mining overall height in one times. ,Designed first mining district, the length of working face is 200 m, which uses fully-mechanized coal mining technology, and fully caving method to deal with goaf. The working system is “three-eight”,with two teams mining, and the other overhauling. Every mining team makes three working cycle, with4working cycle everyday. Advance of working cycle is 0.8 m, In the initial stage, the mine apply centralized and exhaust ventilation, and partition type ventilation in later stage. Band trackless rubber tire vehicle shoulder the auxiliary hoist and transportationKeywords:shaft; up-dip and down-dip minging; transportation、ventilation、environmental protection2
收藏
編號:4298621
類型:共享資源
大?。?span id="cshi5pn" class="font-tahoma">2.50MB
格式:ZIP
上傳時間:2020-01-05
50
積分
- 關(guān) 鍵 詞:
-
含CAD圖紙+文檔
淮北
礦業(yè)集團
煤礦
開采
設(shè)計
cad
圖紙
文檔
- 資源描述:
-
壓縮包內(nèi)含有CAD圖紙和說明書,均可直接下載獲得文件,所見所得,電腦查看更方便。Q 197216396 或 11970985
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。